Construction time: 2016                      
Construction site: Fuzhou, Fujian Province
Project type: Emergency Repair of Collapsed Roads
Equipment type: 100L Crawler Excavator
 
In 2016, at a mountain highway repair site in Fuzhou, Fujian Province, the passage of the road was severely hindered by scattered stones. To swiftly address the issue, the Topper 100L crawler excavator tirelessly worked around the clock, effectively clearing the scattered gravel and ensuring the prompt restoration of the road for smooth passage.
Topper Participate in the Emergency Repair of Collapsed Roads